Ergon came to us in two phases. The first was new construction, a headquarters expansion roofed with a Siplast modified bitumen system, metal coping, and paver decks across the east and west plazas. The second was a reroof of the existing headquarters building with the same Siplast system and coping. Plaza pavers, a corporate headquarters, two distinct scopes under one standard.